ASCP Vs MRP






ASCP Vs MRP









Difference Between MRP vs ASCP


S.No
Features
MRP
ASCP
1
Quantity On Hand shown in supply/demand screen
No
Yes
2
Multi-level pegging
No
Yes
3
Ability to define queries and publish to planners
No
Yes
4
Vertical Plan / Gnatt Chart
No
Yes
5
Plan for alternate sources and alternate resources
No
Yes
6
Plan with optimization rules
No
Yes
7
Constrained plan (ECC / EDD / lead time constraints)
No
Yes
8
VMI Support
No
Yes
9
Powerful simulations
No
Yes
10
Different calendars for shipping / manufacturing / receiving
No
Yes
11
Multiple instance planning
No
Yes






MRP Problems
Capacity Infeasibility
Long Lead Times
            Lead Time Fixed
            Planner “Covers” themselves with long lead times

Advantages in ASCP
Fast (Generally)
            Less then 10% of the time required to run MRP.
What if Analysis
Better solution than MRP
Better User Interfaces (Generally)
Better access to data
Minimize tradeoff between capacity inventory and customer service.




Schedule Instability
The key capabilities of Oracle ASCP are:

1.Holistic Optimization, Planning, and Scheduling. Oracle ASCP can plan all supply
chain facilities simultaneously. Short-term detailed scheduling and long-term
aggregate planning are supported within a single plan. This single plan also
supports multiple manufacturing methods, including discrete, flow, project, and
process manufacturing.

2.Finite Capacity Planning and Scheduling. Oracle ASCP generates feasible supply
chain plans that consider both resource and material constraints.

3.  Optimization. Users can easily configure Oracle ASCP to optimize specific business
criteria. No programming is necessary to access Oracle ASCP's powerful
mathematical optimization capabilities.

4.  Backward Compatibility. Oracle ASCP's component architecture allow it to be
deployed against any version of Oracle transaction systems.

5.  Workflow-Driven Exception Messaging. Oracle ASCP's exception messages alert
planners to critical issues across the extended supply chain. Workflows that drive
these exceptions route data to and feedback from trading partners as required, thus
effectively involving them in the supply chain planning process.

6.  Global Accessibility. Oracle ASCP's database-centric architecture stores plan data in
a central planning server database. These data are accessible from anywhere via a
simple browser. It is possible for multiple planners to simultaneously access data
from a single plan.

7.  Integrated Planning and Execution. Oracle ASCP's Advanced Planner Workbench
user interface not only displays plan results, but also allows planners to execute
planning recommendations. Planners do not have to move to the transaction system
to perform plan execution.

8.  Simulation Capability. Oracle ASCP allows many types of changes to supply,
demand, plan options, and resource profiles to simulate changing business
conditions. You can generate a plan considering all the changes that have been
entered via the Planner's Workbench. Unlimited numbers of scenarios can be
simulated and compared using online planning, copy plans, and exceptions.
Examples of the types of changes are firming, changing sources, modifying
quantities and dates, modifying priorities, modifying resource availability,
modifying supplier capacity, and modifying objective weights